Dear Experts,
I have installed SAP PI 7.4 on windows 2012.
client requirement was to implement central SLD on production server so for DEV and QAS i have configured local SLD and performed initial
CTC wizard.
Now production server is ready and all local SLDs needs to be converted to central SLD,so my doubt is
1) is SAP note 720717 is suficient?
2) If not then what are the additional steps i need to follow
3)Also whether there is a need to perform CTC wizard again.
Warm Regards,
Sumit